Short answer: most roof replacements on homes around Mobile and Baldwin County take 1 to 3 days. A simple, average-size roof is often done in one long day. Bigger, steeper or more cut-up roofs, or roofs with a lot of rotten decking, can take two or three. Weather is the wild card, and we never leave a roof open overnight.
Here is what actually happens, day by day, so you know what to expect before the trucks show up.
What Changes How Long It Takes
- Size: a 15-square roof goes faster than a 30-square roof. One square is 100 square feet of roof.
- Steepness: steep roofs need more safety setup and slower, careful work.
- How cut-up it is: valleys, dormers, chimneys and skylights each need extra flashing work.
- Layers to tear off: two old layers take longer to remove than one.
- Rotten decking: we can’t see every soft spot until the old shingles come off. Replacing a few sheets adds little time; a full re-deck can add a day.
- Weather: rain or high wind can push the schedule. We would rather wait a day than rush.
Before Day 1
- Inspection and written estimate: we measure the roof, check the attic and decking from inside, and give you a written price with photos.
- Scheduling: we pick a date with a good forecast and confirm with you a day or two before.
- Materials delivered: shingles, underlayment, drip edge and vents usually arrive the day before or that morning, along with a trailer or dumpster for the old roof.
Day 1: Tear-Off, Decking and Dry-In
- Protect the property: tarps over bushes, flower beds, AC units and around the house to catch debris.
- Tear-off: the old shingles, felt and worn-out vents come off down to the wood.
- Check the decking: we walk the bare deck, mark soft or rotted spots and show you photos. Bad sheets are replaced, at $90 per sheet, only where we find rot.
- Drip edge and underlayment: new metal drip edge goes on the edges, a leak barrier goes in the valleys and around problem areas, and synthetic underlayment covers the rest of the deck.
- Dry-in: by the end of the day, the roof is sealed against rain even if shingles are not finished. That is how we make sure an afternoon storm doesn’t turn into a leak.
On a smaller, simple roof, shingles go on the same day and the job is finished by evening.
Day 2: Shingles, Flashing and Vents
- Starter strip and shingles: architectural shingles go on from the bottom up, nailed to the manufacturer’s pattern. We install architectural shingles only, never 3-tab. Here’s why we only install architectural shingles.
- Flashing: new step flashing at walls, flashing around chimneys, and sealed pipe boots on every plumbing vent.
- Ventilation: ridge vent or new roof vents, matched to the soffit vents so the attic can breathe.
- Ridge cap: the last row of shingles along the peaks.
Day 3 (Bigger or Complex Roofs): Finish and Clean Up
- Final details: any remaining slopes, flashing touch-ups and sealing.
- Cleanup: tarps come down, debris goes in the trailer, and we sweep the yard and driveway with a magnet to pick up stray nails.
- Final walk-through: we show you photos of the finished roof, including the parts you can’t see from the ground.
How to Get Ready for Roof Day
- Move cars out of the driveway and garage the night before.
- Take down wall hangings and shelf items on top-floor walls. Hammering can shake things loose.
- Cover things in the attic with a sheet. Some dust and old granules can fall through during tear-off.
- Plan for pets and kids. It is loud, and there are ladders and falling debris around the house.
- Give your neighbors a heads-up about the noise and the trailer.
See Real Examples
Our project pages walk through real jobs step by step, with photos:
- Full re-deck and new roof in Mobile, AL (36606)
- New decking, ridge vent and architectural shingles in Daphne, AL
Frequently Asked Questions
Do I need to be home during the roof replacement?
Not the whole time. It helps to be there at the start, in case we find rotten decking you want to see, and at the end for the final walk-through. Many homeowners go to work and we send photos.
Can you replace a roof in the winter in Mobile?
Yes. Our winters are mild enough to roof most of the year. On cold days we follow the shingle manufacturer’s cold-weather steps so the shingles seal properly.
What if it rains in the middle of the job?
We watch the forecast closely and only tear off what we can dry in that day. If rain pops up, the open area gets covered right away.
How much does a new roof cost?
Architectural shingle roofs run $410–$460 per square, about $6,750–$11,250 for most homes. Try our roof cost calculator for a ballpark, or read the full roof replacement cost guide.